If approved, these applications reflect the key environmental approvals required for the project to be built. In November, we lodged the Notices of Requirement and resource consent applications for the new highway and shared use path with Horizons and Greater Wellington Regional Councils, and Horowhenua and Kāpiti Coast District Councils. Further consideration of alternatives for east of Levin segment multi-criteria analysis report - appendices Ģ022 Ōtaki to north of Levin – Notices of Requirement and resource consent applications.Further consideration of alternatives for east of Levin segment multi-criteria analysis report.Consideration of alternatives multi-criteria analysis summary report - appendices.Consideration of alternatives multi-criteria analysis summary report.

download corridor 7 menu

Ō2NL summary of consideration of alternatives multi-criteria analysis

  • Appendix F.4 - Final Ō2NL engagement report – December 2022.
  • Appendix F.3 - Engagement summary report, August-September 2020 engagement (March 2021).
  • Appendix F.2 - Interim engagement summary, August-September 2020 engagement (December 2020).
  • Appendix F.1 - Short list options engagement summary report (2018).
  • Ō2NL final detailed business case board-endorsed August 2022.
  • 2023 Ō2NL detailed business case, subject to funding approval

    download corridor 7 menu

    The following technical reports have been prepared for the Ōtaki to north of Levin project.